论文部分内容阅读
以海西金融大厦为例,详细介绍SMW工法在海西金融大厦基坑支护的应用,从设计、施工、检验等全过程各环节的具体情况,以期与该工程地质条件类似的其他工程在设计和施工方面具有一定的借鉴和参考作用。
Taking the Hercynian Financial Building as an example, this paper introduces the application of SMW method in the foundation pit support of Hercynian Financial Building in detail. The concrete conditions of each link in the whole process of design, construction and inspection are as follows: Design and construction has some reference and reference.