Recent advances in high slope reinforcement in China:Case studies

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:qinggo1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper reviews a number of engineering technologies and workmanships for addressing the challenging issues concerning possible landslides in large-scale slope reinforcement projects in China.It includes:(1) the multi-point anchored piles with a depth of 64 m in the Jietai Temple rehabilitation project,(2) soil nailing strengthened by driven pipe grouting technique covering an area of530 m × 100 m(length × height) in the Xiluodu hydropower project,(3) the cantilever piles extending vertically from the slope toe to stabilize a 300 m high slope at the Xiaowan hydropower station,(4) a new and simple workmanship for building a pile with cross-sectional area of 20 m × 5 m in the Hongjiadu hydropower station,and(5) comprehensive reinforcement scheme proposed for excavation of a 530 m high slope in Jinping I hydropower station.These new technologies can provide valuable experiences for reinforcement of high slopes of similar projects in China and other regions and countries with similar geological conditions. This paper reviews a number of engineering technologies and workmanships for addressing the contemporary issues concerning possible landslides in large-scale slope reinforcement projects in China.It includes:(1) the multi-point anchored piles with a depth of 64 m in the Jietai Temple The rehabilitation project,(2) soil nailing strengthened by driven pipe grouting technique covering an area of ​​530 m × 100 m(length × height) in the Xiluodu hydropower project, (3) the cantilever piles extending vertically from the slope toe to stability a 300 m High slope at the Xiaowan hydropower station,(4) a new and simple workmanship for building a pile with cross-sectional area of ​​20 m × 5 m in the Hongjiadu hydropower station, and(5) comprehensive reinforcement scheme proposed for excavation of a 530 m high slope in Jinping I hydropower station.The new technologies can provide valuable experiences for reinforcement of high slopes of similar projects in China and other regions and countries with similar Geological conditions.
其他文献
up to one’s ears可以解释成“很忙”的意思。如:Half the people in my office are home sick,so I’m up to my ears!我办公室里有一半的人有病请假,所以我简直忙得不得了
郑继密转业前上过大学,当过军医,任过院长,多次立功和受嘉奖。1992年转业到唐山市工人医院任院长助理兼医教部主任。1997年调到负债500万元的唐山眼科医院任院长、经过不懈
本文建立了驱动轮牵引性能的计算机仿真模型,对常用驱动轮在不同路面上的牵引性能指标作了计算机仿真,分析了驱动轮的最佳工作参数及其高效工作范围。在此基础上.推荐了驱动轮的
董振堂(1895—1937)河北新河人。1922年保定陆军军官学校毕业分配到西北军。1927年任国民党第二集团军第三十六师师长。1931年春被蒋介石调江西参加围剿红军,同年12月14日和
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
翻过一道山梁,绳一样的小路把我们引进一个山口。顿时,一个群山环抱、苍翠欲滴的小村庄出现在眼前。这就是河北省丰润县潘家峪村。1941年1月25日,日本侵略者在这里制造了震
6月23日夜间1时,六师共青团农场五连民兵班班长陈孝江和连队的5名民兵一身戎装在辖区巡逻。“我喜欢这身军装,穿上军装就觉得自己还是个兵,作为兵团的‘兵’,我感觉特别自豪!
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
期刊
解应用题的主要困难在于列方程困难。而列方程的难易又取决于设元是否合理.本文针对题目的特征,介绍设元的若干技巧.一、根据题问,直接设元例1分一堆苹果给三只猴子,第一只猴
7月1日上午,四师七十三团金琪珊超市里一派繁忙的景象,来自伊宁市的个体工商户陈春燕和她的16名营业员正忙着把货物上架。陈春燕说:“这个1400平方米的超市,我投资了350万元,