Effect of Saliva Contamination on Shear Bond Strength of Orthodontic Brackets When Using a Self-Etch

来源 :华中科技大学学报(医学英德文版) | 被引量 : 0次 | 上传用户:Mciael
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The effect of saliva contamination on the shear bond strength of orthodontic brackets, at various stages of the bonding procedure using a new self-etch primer was studied. The samples were divided into 4 groups according to 4 different enamel surface conditions: Group A: dry; Group B: saliva contamination before priming; Group C: saliva contamination after priming, and Group D: saliva contamination before and after priming. Stainless steel brackets were bonded in each test group with a light-cured composite resin (TransbondXT 3M). The shear bond strength was determined in the first 30 min after bonding. The analysis of variance indicated that the shear bond strengths of the 4 groups were significantly different (F= 11.89, P<0.05). Tukey HSD tests indicated that contamination both before and after the application of the acid-etch primer resulted in a significantly lower (=4.6± 1.7 MPa) shear bond strength than either the control group (= 8.8±1.9 MPa) or the groups where contamination occurred either before ( = 7.9± 2.0 MPa) or after (=6.9±1.5 MPa) the application of the primer. It was concluded that the new acid-etch primer could maintain adequate shear bond strength if contamination occurred either before or after the application of the primer. On the other hand, contamination both before and after the application of the primer could significantly reduce the shear bond strength of orthodontic brackets.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
繁忙的都市生活和紧张工作压力常常令人喘不过气:腰酸背痛,关节僵硬,脖子酸疼,肌肉僵硬,就像一部受损的机器。长期处于过劳状态和亚健康状态的“白骨精”们,赶紧响应身体发出的信号,解决你的身体“过劳肌”。  部位:颈部  对症出击:滋润乳+按摩滋润乳  推荐理由:按摩加体膜。运用天然滋润乳,使其内含的丰富微量元素通过按摩被肌肤完全吸收。对皮肤而言,可以提高皮肤中的氧化率和温度,促进氧气交换并且刺激血液循
目的探讨GJB2、SLC26A4基因突变在中国西北地区非综合征型耳聋(nonsydromic hearing impair-ment,NSHI)患者中的突变频率及主要的突变方式。方法采集中国西北地区801例非综合
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥