论文部分内容阅读
通过对湘钢厂外既有铁路物流运输系统的分析研究,结合湘钢“十一五”规划700万t钢规模所需运量,探讨湘钢铁路工业站改扩建方案,通过比选,推荐出合理的改扩建方案。
Through the analysis of the existing railway logistics and transportation system outside the Xiangtan Iron and Steel Plant, combined with the required volume of 7 million tons of steel planned by Xiangtan Iron and Steel in the “Eleventh Five-year Plan” to explore Xiangtan Iron and Steel Railway Industrial Park expansion project, through the comparison and selection A reasonable renovation and expansion program.