一、前言阿木川坝是一座心墙式堆石坝,高102m、坝顶长430m、坝体积450万m~3,目前,正在木曾川水系阿木川上施工。该工程自1981年8月动工以来,进展顺利,于1986年3月开始填筑心墙,直到同年9月底为止,坝体填筑量约完成100万m~3。阿木川坝的一期围堰用碾压混凝土施工,完建后,于1983年9月,遭遇到10号台风引起的大水,致使堰顶溢流,曾担心会受到破 I. Introduction Amuchuan dam is a heart-wall rockfill dam with a height of 102m and a crest length of 430m and a dam volume of 4.5 million m 3. Currently, construction is taking place on Amu River in Muzichuan River. Since the commencement of construction in August 1981, the project has progressed smoothly. Since March 1986, the heart wall has been completed. Up to the end of September of the same year, the volume of dam construction has been completed at about 1 million m 3. Amu chuanba a cofferdam construction with roller compacted, after the completion of construction, in September 1983, encountered 10 typhoon caused by the flood, resulting in weir overflow, had been worried about will be broken
其他文献
山西平遥县尹回水库原是一座小(一)型水库,坝体为均质土坝,坝高12.5米。1977年8月水库泄洪时,因消力池破坏,导致坝体决口。坝体修复时,将水库扩建为中型水库,坝高为20.4米,
为学习了解国外水资源科学的先进经验和发展动向,为促进我国水资源科学事业的发展,在阅读翻译外文资料中常常见到缩略语,令人难解。为此,河海大学吴志才工程师将多年来从大
非木质林业资源不仅是宁夏多功能林业发展的重要组成,也是促进当地农民增收和农村发展的重要途径,宁夏格外重视非木质林业资源的发展和利用。在对宁夏非木质林业资源发展利用
请下载后查看,本文暂不支持在线获取查看简介。
纵览东北二人转传统剧目,演唱中国历史故事的剧目,较早的当属东周列国时期的楚国宫廷故事。其故事均在基本符合史载资料的基础上,增加若干艺术虚构情节,依故事发生时间顺序而构成
7XK—50型自动卸粮坑1984年开始研制,1987年通过科研鉴定,已在垦区一些大中型粮食处理中心推广应用。应一些同志的要求,现将地下防水方案简介如下,仅供参考。该方案没有用防
作为教育者,每一次的突然或偶然的教育事件对我们都是一次深刻的自我教育,给我们反思的契机,让我们又一次在教育的误区中醒悟,重新审视自己的教育方法、分析自己的教育效果,
一、电站概况荔枝窝水电站位于四川省高县境内的南广河下游,距来复镇约两公里,系坝后厂房开敞式电站,是一个以发电为主,兼具航运、防洪多效益的综合性水利水电工程。站址枢
ONS(Olympic News Service),即奥林匹克新闻服务(法文为Leservice d’information olympique)。奥运会期间,它充当组委会官方通讯社的角色,为奥林匹克大家庭成员。北京奥运会
修订后的《事业单位财务规则》(财政部第68号令)(以下称新《规则》)已于2012年2月7日发布并于4月1日正式实施。它是以事业单位分类改革为基础,结合现阶段事业单位财务管理和