论文部分内容阅读
阐述杭州湾跨海大桥承台在采用新的钢套箱施工工艺条件下,基础钢管桩采取阴极保护防腐时,钢管桩与钢套箱的绝缘施工问题。
This paper describes the insulation construction of steel pipe pile and steel box under the condition of adopting the new steel box construction technology for the cap of Hangzhou Bay Bridge and the cathodic protection and corrosion protection of the foundation steel pipe pile.