红石金矿采用炭浆法回收金银的生产是从1989年8月开始至1990年7月尚未达到设计指标,浸出率低6.76%,吸附率低9.17%,本文就其两个问题加以讨论。
The recovery of gold and silver produced by Hongli Gold Mine by the coal slurry method has not yet reached the design targets from August 1989 to July 1990 with a low leaching rate of 6.76% and a low adsorption rate of 9.17%. This article discusses two issues .