基准单方造价比较法的最大特点是在确定房屋“最基本标准条件下”的单方建筑造价的前提下进行被估建筑单方造价的对比计算。不同的限定条件对应于不同的单方造价。基准单方造价的确定方法包括竣工结算调整法、概预算法和市场调查法。在应用中,可以用差异系数调整单方造价,也可以采用单方造价增加值来实现。
The most important feature of the benchmark unilateral cost comparison method is the comparative calculation of the unilateral construction cost of the assessed building under the premise of determining the unilateral construction cost under the “most basic standard conditions” of the house. Different qualification conditions correspond to different unilateral costs. The method of determining the unilateral construction cost includes the settlement adjustment method, the budget estimation method and the market research method. In the application, the coefficient of variance can be used to adjust the unilateral cost, but also can use unilateral cost added value to achieve.