论文部分内容阅读
吉林省地质矿产局在改革开放的形势下,本着《调整结构,加速发展,提高效益,增长后劲》的精神,几年来积极开展黄金储量承包工作,取得了显著地质找矿成果,并获得较好社会经济效益。全局共承担黄金储量承包工作八项,其中两项(黄松甸子砾岩型金矿、荒沟山金矿)属国家“八九二”黄金储量承包重点项目;五项(兰家金矿、八台岭金矿、东方红金矿、通化南及九三沟金矿)为省区储量承包项目;一项(海沟金矿)为重点矿山扩建项目。目前已完成一项经省储委审批核准,其他七项近尾声,于九三年末将全部完成。共投入坑道11678.08m.钻探72494.56m,槽探124445.89m~3,浅井30.38m,已完成预计黄金承包储量的70%。对延边珲春市黄松甸子砾岩型金矿勘探评价工作,在我国尚属首次,勘探过程中还应用了具有先进技术
Under the situation of reform and opening up, the Jilin Province Bureau of Geology and Mineral Resources has actively carried out gold deposit contracting work in the spirit of “adjusting structure, accelerating development, improving efficiency, and increasing stamina” in the context of reform and opening up, and achieved remarkable geological prospecting results and obtained comparative results. Good social and economic benefits. Globally, it has undertaken eight gold deposit contracting projects, two of which (the Huangsongdian conglomerate type gold mine and the Huanggoushan gold mine) are the national “892” gold deposit contracting key projects; five items (the Lanjia Gold Mine, The Badailing Gold Mine, Dongfanghong Gold Mine, Tonghuan South, and Jiusangou Gold Mine are provincial reserve contracting projects; one (Caigou Gold Mine) is a key mine expansion project. At present, one has been approved by the Provincial Reserve Committee and the other seven are nearing completion and will be completed by the end of 1993. A total of 11678.08m tunnels were drilled, 72494.56m drilling, 124445.89m~3 trench exploration, and 30.38m shallow shaft. 70% of the projected gold reserve was completed. The exploration and evaluation work of the Huangsongdian conglomerate gold deposit in Hunchun City of Yanbian City was the first time in China, and advanced technology was applied in the exploration process.