论文部分内容阅读
陆上塑料排水带作为加快软土地基排水加固的方法,目前广泛应用于公路、水利等地基处理工程。但滩涂圈围工程中塑料排水板施工由于受施工机械、潮流、滩涂淤泥等因素的影响,施工难度大,施工质量不易控制,工程实例尚不多。本文结合上海临港新城滩围涂工程施工实例,介绍了滩涂圈围工程中塑料排水板控难点及相应监理措施,以供同行参考并指正。
As a method to speed up drainage and reinforcement of soft soil foundation, land plastic drainage belt is widely used in foundation treatment projects such as roads and water conservancy. However, due to the influence of such factors as construction machinery, tide and mud on the beach, the construction of plastic drainage plates in the encircling beach area is difficult to construct and the construction quality is not easy to control. In this paper, Shanghai Lingang Xincheng Beach coater project construction examples, introduced the beach surrounded by plastic drainage board control difficulties and the corresponding supervision measures for peer reference and correction.