论文部分内容阅读
在对公路施工网络计划技术进行实用研究的基础上,就公路施工网络计划提出了工序划分五原则;明确了公路施工进度计划中的时日的两种表示法,描述了它们之间的换算关系。并结合我国公路施工进度计划管理的特点和人们制定施工进度计划时的现行思维方式,探讨了工序隶属度的计算方法,在此基础上,建立了考虑各工序隶属度的适合公路工程的单代号最小时距搭接网络的计算公式。从而促进网络计划技术与公路施工的结合,改变网络计划技术与公路施工特点脱节的状况
Based on the practical research on highway construction network planning technology, five principles of process division are put forward on the highway construction network plan. Two expressions of the time in highway construction schedule are defined, and the conversion relations between them are described . Based on the characteristics of schedule management of highway construction in our country and the current thinking mode of people when formulating construction schedule, the calculation method of process membership degree was discussed. Based on this, a single code for highway construction considering the membership degree of each process was established. The minimum time lap network calculation formula. So as to promote the combination of network planning technology and highway construction and change the disconnection between network planning technology and highway construction characteristics