目前,锅炉房的设计管理未纳入正常的轨道,锅炉房工艺设计单位未规定进行定点审查,一些未具备设计条件和技术力量不足的单位及锅炉用户设计锅炉房,使锅炉房建造未按有关规定进行,直接影响了锅炉的安全运行和文明生产。为此,我市根据国务院发布《锅炉压力容器安全监察暂行条例》的规定,对市区的新建、扩建锅炉房的平面布置图及标明与有关建筑距离的图纸进行审查。审查的内容为锅
At present, the boiler room design and management is not included in the normal track, the boiler room design unit does not provide for fixed-point review, some do not have the design conditions and lack of technical strength of the unit and the boiler user design boiler room, boiler room construction not in accordance with the relevant provisions , A direct impact on the safe operation of the boiler and civilized production. To this end, the city under the State Council promulgated the “Provisional Regulations on the Safety Supervision of Boiler and Pressure Vessel” requirements, the urban area of the new and expanded boiler room floor plan and indicate the distance with the construction drawings to review. Review the contents of the pot