论文部分内容阅读
正在施工的鲭川抽水蓄能工程位于东京以北约150km处。该工程包括修建上、下水库和一座装机为900MW的电站。这两座水库将由一条2.3km长的隧道连接,获得338m的有效落差。这项工程包括两个主坝,上坝(八音坝)为沥青
The Kakcheon pumped storage project under construction is located about 150km north of Tokyo. The project includes the construction of upper and lower reservoirs and a power plant installed capacity of 900MW. The two reservoirs will be connected by a 2.3km long tunnel with an effective fall of 338m. The project consists of two main dams, the dam (octave) as asphalt