论文部分内容阅读
模拟亦庄调节池工程中各种设计运行工况,通过观测研究取水口附近流态、水位、流速变化规律,分析水流结构对取水口影响,为进一步完善设计方案提供数据支持。同时验证调节池进口前池消能效果;提出泵站和水厂取水调度方案;确定取水口拦污栅水头损失。为亦庄调节池工程的安全运行提供保障。
By simulating Yizhuang various design and operating conditions in the pool project, by observing the changes of flow pattern, water level and velocity in the vicinity of the water intake, the influence of the water flow structure on the water intake was analyzed, providing data support for further improvement of the design scheme. At the same time, it verifies the effect of energy dissipation in the front pool of the regulating pool; proposes the water pumping schedule of the pumping station and waterworks; and determines the head loss of the water traps. Yizhuang adjustment pool project to ensure the safe operation.