论文部分内容阅读
中铝宁夏能源集团六盘山热电厂于2010年10月,以短短20个月实现两台机组并网发电的成绩,创造了全区“热电速度”。改变了宁南地区缺电历史。此外,六盘山热电厂具有每年可向城市提供1078万平方米的供暖能力,实现循环处理和使用城市污水,实现煤电联动、能源就地转化,对调整和优化固原地区经济产业格局,改善民生质量,提高生活水平,推动节能环保,保护生态环境以及全面加快革命老区的经济发展和百姓脱贫致富均发挥了重要作用。“送无限阳光春风给冬天,还一片蓝天白云给人民”。六盘山热电厂在持续发展的
In October 2010, Chinalco Ningxia Energy Group Liupanshan Thermal Power Plant achieved the result of grid-connected power generation of two units in just 20 months, creating the region’s “thermoelectric speed”. Change the power shortage in southern Ning history. In addition, the Liupanshan Thermal Power Plant can provide 10.78 million square meters of heating capacity to the cities every year to realize the recycling treatment and use of urban sewage, coal linkage and energy conversion in place, and to adjust and optimize the economic and industrial structure in the Guyuan area and improve people’s livelihood quality , Improve living standards, promote energy-saving and environmental protection, protect the ecological environment and accelerate the economic development of the old revolutionary base areas in general and the people out of poverty and have become rich. “To send unlimited sunshine spring to the winter, but also a blue sky to the people ”. Liupanshan Thermal Power Plant in the sustainable development