过军渡水利枢纽(电站)工程为涪江梯级开发的第42级电站,枢纽主体工程距遂宁城区约8 km,是遂宁市建市以来投资最大的基础设施建设项目,总投资8.3亿元。电站采用河床式开
The Jundu Hydropower Project (Substation) is the 42nd power station developed by the cascade of Fujiang River. The main hub project is about 8 km away from the urban area of Suining. It is the largest infrastructure construction project invested by Suining since its establishment, with a total investment of 830 million yuan. Power station using river-type open