利用流量误差曲线法和直方图法快速调校油田批量水表

来源 :国外油田工程 | 被引量 : 0次 | 上传用户:numifan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对油田水表调校耗时多、效率低这个问题 ,经多方研究和实践 ,归纳出利用流量误差曲线性质和直方图来快速检定油田批量水表的方法。该方法经过半年多的现场应用 ,使批量水表的校验效率整体提高了5 8% ,水表的二次调校次数减少了 75 % ,取得了令人满意的使用效果和显著的经济效益 Aiming at the problem of time-consuming and inefficient adjustment of oilfield water meters, the multi-party research and practice have summarized the method of rapid verification of oilfield batch water meters by using the characteristics of flow error curves and histograms. After more than six months of field application, the verification efficiency of the batch water meter has been increased by 58% as a whole, and the number of secondary calibration of the water meter has been reduced by 75%. Satisfactory results and remarkable economic benefits have been obtained
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AM 10 2井目的层是纯砂岩薄气层。为了确保水平段在产层穿行 ,首先钻井斜角为 5 6 95°领眼 ,卡准目的层位置及厚度。填领眼 ,设计水平段的轨迹 ,侧钻。钻水平段时 4次调整
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
美国对台军售政策是美国对华政策的重要组成部分。里根总统执政前,中美两国虽已建交,但美国对台军售问题仍然没有得到解决,从而成为了中美两国建交后阻碍中美关系发展的最大遗留
本文通过对荣华二采区10