论文部分内容阅读
由韩国金属学会和英国金属学会联合组办的钢铁厂应用计算机控制生产的国际会议,将于1993年11月1~5日在汉城召开。这次会议的目的是为了促进钢铁生产过程控制系统的发展,研讨今后的方向。会议内容包括生产计划和系统控制的所有领域,即从接受定单到发货的各个环节。但不包括个别设备的计算机控制。详细内容如下。 1.生产计划系统:a)需求预测,b)生产计划(年、季),c)生产信息处理系统; 2.定货登记:a)定单查询,b)定单分类及编码,c)投产安排①车间的分配,②设备负荷控制;
The International Conference on the Application of Computer Controlled Production by the Iron and Steel Works Co-organized by the Korean Metal Society and the British Metal Society will be held in Seoul from November 1 to 5, 1993. The purpose of this meeting is to promote the development of steel production process control system and to study the future direction. The meeting includes all aspects of production planning and system control, from the acceptance of orders to delivery of all aspects. It does not include computer control of individual equipment. Details are as follows. 1. Production planning system: a) demand forecast, b) production plan (year, season), c) production information processing system; 2. order registration: a) order inquiry, b) order classification and coding, c) Workshop allocation, ② equipment load control;