论文部分内容阅读
在工程质量检查与验收中,常可以看到一些工程的室内一般抹灰与釉面砖镶贴在细部存在着一些问题。一、一般抹灰质量弊病的防治1.墙面与顶棚交接处的水平线不顺直、不水平。从交圈整体看,顶棚面四角标高不一致,导致门窗口两端至顶棚面距离不等。原因:楼板自身缺陷;模板安装不水平,或虽水平,但在混凝土浇筑时受振变形;上底灰前,缺乏通盘检查,交底无针对性,未对原缺陷处采取修补措施。防治:上底灰前,操作人员应掌握必须修补处理部位,并先期修补处理完毕,后
In the project quality inspection and acceptance, you can often see some of the works of indoor general plaster and glazed tile veneer in the details there are some problems. First, the general disadvantages of the quality of plaster prevention and treatment 1. The level of the wall and roof junction is not smooth, not level. As seen from the overall circle, the elevation of the four corners of the ceiling is inconsistent, resulting in both ends of the door and window to the ceiling distance. Reason: the floor itself defects; template installation is not level, or although the level, but in the concrete pouring vibration deformation; on the ash before the lack of overall inspection, pay no pertinence, did not take the original defect repair measures. Prevention: on the ash at the bottom, the operator should grasp the need to repair the treatment site, and pre-repair treatment is completed, after