【摘 要】
:
螺旋加速器采用脊型加速器的谐振加速腔。为了提高脊型极板内的束流孔道数量,我们提出了螺旋运动方式。脊型加速器采用蛇形加速方式,即电子的加速与传输在一个平面上,电子通
论文部分内容阅读
螺旋加速器采用脊型加速器的谐振加速腔。为了提高脊型极板内的束流孔道数量,我们提出了螺旋运动方式。脊型加速器采用蛇形加速方式,即电子的加速与传输在一个平面上,电子通过加速腔完成一次加速后,偏转180°重新注入加速腔,整个加速传输运动轨迹为往复型的。180°偏转需要较大的偏转空间,导致极板内排布的束
Helical accelerator uses the acceleration accelerator cavity of the ridge accelerator. In order to increase the number of beam channels in the ridge plate, we propose a spiral motion. The use of a serpentine acceleration of the ridge accelerator, that is, the acceleration and transmission of electrons in a plane, the electron acceleration through the acceleration chamber to complete an acceleration, the deflection of 180 ° re-injection into the acceleration chamber, the entire acceleration transmission trajectory for the reciprocating. 180 ° deflection requires a large deflection space, resulting in the arrangement of the beam within the plate
其他文献
目的探讨中西医结合治疗妊娠高血压综合征合并糖尿病患者的临床疗效。方法选取2010年1月至2014年12月东莞市第八人民医院收治的200例妊娠高血压综合征合并糖尿病患者作为研究
The high temperature gas-cooled reactor pebble bed module(HTR-PM)in constructionhas the characteristics of the fourth generation reactors and it is different bo
To meet the increasing demand of monitoring absorbed dose in the radiation processing area,we developed a type of dosimeters,labeldosimeters,which changed their
Radioactive aerosol monitors were used to monitor the radioactive substance concentration or the total amounts in effluents from the nuclear facilities,in accor
This research mainly adopts gamma spectroscopy to detect the pipeline retention.The calculation of retention of uranium has been obtained based on the intensity
微波系统是10MeV/20kW辐照用电子直线加速器的主要分系统之一,它为加速器的核心部件加速管提供高功率微波,加速电子束到设计能量,高能电子束从加速管引出并扫描后,用于产品辐
China Reprocessing and Radiochemical Laboratory(CRARL)had completed two rounds of hot tests as of 6 o’clock,December 26~(th),2015.After bench hot test,research
近日,国家发展改革委、国务院足球改革发展部际联席会议办公室(中国足球协会)、体育总局、教育部共同编制的《中国足球中长期发展规划(2016—2050年)》日前印发。规划提到,未
As an excellent detection nuclide,~3 He is widely used to preparation neutron detector.However,present supply of ~3 He is shortage and can no longer meet the de
With beam current reaching 800 ep A in the Faraday cylinder installed at the high powered terminal of HI-13 tandem accelerator,the first joint commissioning of