论文部分内容阅读
加拿大克利夫兰坝建于1954年,1992年对该坝进行了升级改造。介绍了该坝RCC上游铺盖和塑性混凝土防渗墙的施工情况。
Cleveland dam in Canada was built in 1954, 1992, the dam was upgraded. The construction of RCC upstream dam cover and plastic concrete cutoff wall is introduced.