水口水电站是我国引用世界银行贷款兴建、土建工程实行国际招标的工程,目前正处于施工阶段。经过国内外专家的多次咨询、设计复查和设计人员的努力,采用新的技术,压缩了工期。不断改进设计,如岩石开挖采用预裂爆破和垂直边坡,提高导流明渠和引水渠底板高程,简化坝基基础处理,改进进厂交通方式,溢洪道闸墩预应力锚束采用上下游对拉布置,改善了墩体应力,坝内大直径钢管设置弹性垫层等,使工程设计不断优化和完善,取得了较显著的效益。另一方面,也取得了经验,认为对于实行招标的工程,设计优化工作,应在招标文件编制之前完成,否则签约之后,由于受到合同的约束,设计优化将会受到一定的限制。
Shuikou Hydropower Station is a project that China borrows from the World Bank for loan construction and civil construction projects are under international bidding. Currently, it is under construction. After many consulting experts at home and abroad, design review and design efforts, the introduction of new technologies, reducing the duration. Continuously improve the design, such as the use of pre-cracking blasting and vertical slope rock excavation to improve diversion channel and diversion canal floor elevation to simplify the dam foundation treatment to improve traffic mode into the plant, spillway pier pier prestressed anchorage using upstream and downstream on the pull Arrangement to improve the pier body stress, large-diameter steel pipe dam set elastic cushion, so that engineering design optimization and improvement, and achieved significant benefits. On the other hand, we have also gained some experience. We think that the design optimization work should be completed before the preparation of the bidding documents for the bidding project. Otherwise, the design optimization will be restricted due to the contract.