宝珠寺水电站中孔工作弧门支铰的支撑牛腿采用后张法预应力锚索结构。工程项目施工复杂 ,技术标准高 ,并且作用在弧门上的水推力大 (单支铰承受 2 .5万 k N) ,相应地张拉吨位大 (主锚索单孔设计锁定吨位为 380 .6 t) ,又属于高空作业 ,给施工带来了难度。根据现场实际情况 ,灵活采用各种施工方案 ,为达到张拉技术要求 ,施工中采用“双控”兼顾测力器观测、校核 ,确保了工程如期交付使用。
Baozhusi hydropower station in the work of the center of the arc arch support hinge leg post-tensioned prestressed anchor cable structure. The project is complex in construction, with high technical standards and high water thrust acting on the arc gate (25,000 kN for a single hinge), corresponding to a large tonnage of tensioning (main anchor single hole design locking tonnage is 380). 6 t), but also belong to the aerial work, to the construction of the degree of difficulty. According to the actual situation on site, all kinds of construction plans are flexibly adopted. In order to meet the technical requirements for tensioning, the “double control” and the dynamometer observation and checkout are adopted during construction to ensure the project is delivered on schedule.