Study on Basin-Filling and Reservoir Sedimentology of Zhu Ⅲ Depression of Pearl River Mouth Basin,So

来源 :Journal of China University of Geosciences | 被引量 : 0次 | 上传用户:lizhihua511352981
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Through basin-filling analysis, one coarsening-upward and two fining-upward sequences have been identified in Zhu Ⅲ depression. In accondance with the general model proposed by Ravnas and Steel (1998), the basin-filling has two large cycles—rift (sediment-balanced and -overfilled) and postrift (sedimentunderfilled and starved). During the rifting process, the rifted lake developed through three stages: early, climax and late. The sedimentary characteristics of reservoir rocks show that barrier bar, lagoon and tidal channel facies well developed in Zhuhai Formation; offshore, tidal and barrier bar well developed in Zhujiang Formation. Neighborly, Shenhu, Wenchang and Enping formations deposited in rifted lakes during Paleogene time; Zhujiang Formation deposited in bay, lagoon and shoreface in late Paleogene. Zhujiang and other formations deposited in offshore and open shallow sea to shelf. Through basin-filling analysis, one coarsening-upward and two fining-upward sequences have been identified in Zhu III depression. In accondance with the general model proposed by Ravnas and Steel (1998), the basin-filling has two large cycles-rift sediment-balanced and -overfilled) and postrift (sedimentunderfilled and starved). The sedimentary characteristics of reservoir rocks show that barrier bar, lagoon and tidal channel facies well developed in Zhuhai Formation; offshore, tidal and barrier bar well developed in Zhujiang Formation. Neighborly, Shenhu, Wenchang and Enping formations deposited in rifted lakes during Paleogene time; Zhujiang Formation deposited in bay, lagoon and shoreface in late Paleogene. Zhujiang and other formations deposited in offshore and open shallow sea to shelf.
其他文献
一、概述该门型系由湖南省交通设计院经多年刻苦钻研,精心设计而创制出来的。其最大的特点是:不需要任何启闭机械设备和人力、电力,只是利用水力就能使闸门沿水平方向自动开
一九七三年我们曾进行了异步电机同步化的试验。试验表明:同步化能够有效地补偿无功功率,提高功率因数。但由于励磁环节采用了三相桥式硅元件整流,当电网电压向下波动时,转
江苏省大丰县在拱桥建设实践中,抓住了桥台砌筑体积大这个主要矛盾,从创造新的桥台型式入手,同时相应改革桥身使之轻型化,从而大幅度降低了农桥圬工数量,使原来建一座桥的经
本文介绍了一种新的AVO方法,该方法允许解释员处理实际数据(这归因于拟3-D可视化模块),避免了单独根据地震处理技术带来的种种限制。研究区(图1)位于西班牙西南部陆上Guadal
水拦关水库为我县老愚公梯级水电站的调蓄水库。控制流域面积46.4平方公里,总库容2,640万立方米。对以下三个梯级引水式电站的发电流量起着调节作用,四级电站总装机8,320瓩
三、进口工作(快速)门工作门孔口净面积6.5×10平米,设计工作水头(后期)60米,口门进流平均流速约为 4.2米/秒.闸门采用胶木支承,单位压力取3吨/厘米在此压力下(摩擦系数最小
在近几年,海相四分量(4C)采集和处理技术的发展使得该项技术在大多数地区和不同水深中的应用成为可能。然而,与常规等浮电缆测量相比,其成本较高,因此它的成功将取决于应用适
山东省乳山市辛家疃物化探异常早在 60~ 70年代就已见诸于资料中 ,但这些异常面积一般都比较大 ,而且范围不够确定 ,不能指导工程的具体布置。近年 ,由于金矿资源匮乏 ,进一步
多次波衰减问题仅得到部分解决。一种最常见的多次波衰减方法是以拉冬变换为基础的。一个普遍接受的观点是抛物线型拉冬变换只能衰减具有较大时差的多次波。我们提出一种新的
上海市建筑材料供应公司第五供应站从1981年起开展了“优质服务”活动,努力为生产建设当好后勤,受到用户好评,并取得了很好的经济效果,销售额和盈余额逐年增长。1983年1至11