外立面分段施工方法,是高层建筑缩短工期的有效途径之一,本文主要以贵阳“未来方舟”H3组团项目的外立面竖向分段施工工程实例为载体,介绍了分段方法、主要施工措施及其分段施工重要性、必要性和可行性。通过工程实践应用总结,为今后类似项目提供参考意见,为解决高层建筑装饰面砖粘贴面积大、工期紧张、多专业扎堆管理混乱等问题提供参考。
Façade segmental construction method is one of the effective ways to shorten the construction period of high-rise buildings. In this paper, the construction example of the vertical sub-construction of the facade of Group H3 project of Gui Yang “Future Ark ” is taken as the carrier, Methods, main construction measures and the importance, necessity and feasibility of the sub-construction. Through the application of engineering practice summary for the future of similar projects to provide reference for solving the high-rise building decorative tiles affixed to a large area, tight schedules, multi-professional get together to manage the chaos and other issues provide a reference.