论文部分内容阅读
“十二五”期间,我国光伏装机年均增速178%,发电量年均增速219%,随之带来了补贴资金需求日益增长,需要通过调整优化光伏发电年度规模管理,疏导可再生能源补贴资金缺口等措施保障新能源持续健康发展。自2014年以来,国家能源局对光伏发电项目实行年度建设规模管理,逐年下达各省年度建设规模。纳入年度建设规模的光伏电站,具备享受国家可再生能源基金补贴资格;分布式光伏发电项目不限制建设规模,建成后即纳
During the 12th Five-Year Plan period, the average annual growth rate of photovoltaic installed capacity in China was 178% and the average annual growth rate of generating capacity was 219%. As a result, the demand for subsidies increased day by day, and the annual scale of photovoltaic power generation needs to be adjusted and optimized Renewable energy subsidy funding gap and other measures to ensure the sustainable and healthy development of new energy sources. Since 2014, the National Energy Administration has implemented the annual construction scale management of photovoltaic power generation projects and annually issued the annual construction scale of each province. Photovoltaic power stations included in the annual construction scale have the right to subsidize the National Renewable Energy Fund; distributed photovoltaic power generation projects do not limit the scale of construction,