索风营水电站坝址、坝线选择的影响因素很多 ,其中最主要的是坝址的工程地质条件、物理地质现象和防渗帷幕等 ;而泄水建筑物的布置和施工进度 ,又是影响坝型选择的主要因素。经过对坝址区工程及水文地质的不断深入勘测和设计比较 ,最终选择中坝址中坝线 ,坝型为碾压混凝土重力坝。文章就该工程的坝址、坝线及坝型选择作简要介绍
Suofengying Hydropower Station dam site, dam line selection of many influencing factors, of which the most important is the dam site engineering geological conditions, physical and geological phenomena and seepage curtain; and drainage construction layout and construction progress, but also affect Dam-type selection of the main factors. After the dam site engineering and hydro-geological exploration and design in-depth comparison, the final choice of dam site in the dam line, dam type RCC gravity dam. The article on the project dam site, dam line and dam type selection for a brief introduction