论文部分内容阅读
从项目施工过程存在的风险因素出发,采用模糊层次分析法(FAHP)作为理论分析工具,构建项目建设在可行性研究过程中的风险分析模糊综合评判模型,对拟建项目在可行性研究阶段的风险进行定量分析与定性评估,增强可行性研究阶段风险评价的可信度,对可行性研究阶段风险分析与评价过程进行相应的完善与提高。
Based on the risk factors existing in the construction process of the project, the Fuzzy Analytic Hierarchy Process (FAHP) is used as the theoretical analysis tool to build the fuzzy comprehensive evaluation model of risk analysis in the process of feasibility study. The feasibility of the proposed project in the feasibility study stage Risk quantitative analysis and qualitative assessment to enhance the credibility of the feasibility study stage risk assessment, feasibility study stage risk analysis and evaluation process to improve and improve accordingly.