论文部分内容阅读
结合工程实例,对连续箱梁支架安装施工技术、现浇梁施工工艺进行了深入探讨和分析,希望为今后桥梁工程运用连续箱梁施工技术提供一些参考。
Combined with the engineering examples, the construction technique of continuous box girder support and the construction technology of cast-in-situ beams are discussed and analyzed in depth. It is hoped that some references will be provided for the future application of continuous box girder construction technology in bridge engineering.