考虑泥沙冲淤的水库调洪计算方法及其应用

来源 :泥沙研究 | 被引量 : 0次 | 上传用户:hbjysd520
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
多沙河流的水库调洪计算,不同于常用的清水河流的水库调洪,主要区別在于库区的泥沙淤积和冲刷对出库的洪峰、洪量及泄空时间均有影响。本文根据挟沙水流平衡方程及水库输沙关系式,提出考虑泥沙冲淤的多沙河流水库调洪计算方法,经用黄河三门峡与二级支流蒲河巴家咀水库的实际资料验证,获得较好的结果,可为多沙河流水库调洪演算应用。 The calculation of reservoir flood diversion in the Dousha River is different from that of the commonly used reservoir flood control in Qingshui River. The main difference is that sediment deposition and scour in the reservoir area have an impact on the flood peak, flood volume and discharge time of the reservoir. Based on the sediment-laden flow balance equation and reservoir sediment transport relationship, this paper proposes a method to calculate the flood control of the Dousha River reservoir considering the sediment erosion and sedimentation. After validating with the actual data of the Sanhe River reservoir and the Sanhe River reservoir, The good result can be used for flood control calculation of the Dousha River Reservoir.
其他文献
黄河含沙量居世界第一位。中游黄土高原的泥沙,通过干支流,每年以约12亿吨带至河口地区。除公元1128至1855年黄河夺淮从黄海入海,经历七百多年的沧海桑田,留下今天的苏北浅
陕西褒河石门水电站在厂房围堰地基防渗帷幕施工中,曾遇到大量漏浆的地层。厂房基坑位于河床的右侧,其底面高程低于河床数米,帷幕灌浆时河床正在过水。围堰的地基为人工开挖
在水工建筑工程地质勘测中,为了研究地质构造或弄清区域水文地质和工程地质特征,对岩石的裂隙进行系统的观测,具有极大意义。裂隙在地壳中的分布,极其广泛,观察证明,自然界
正确选择起动机零部件尺寸及它们之间的匹配关系,可改进起动机的技术经济指标。通过对起动机几个变量最小函数值的研究,以便从许多可行的方案中求得最佳方案。设计起动机时拟
公允价值是国际会计前沿问题。实现我国公允价值会计与国际趋同是经济全球化的必然要求,是我国会计计量发展的一个方向。文章将战略管理中的SWOT分析法应用于公允价值会计,这
本文以《语言学概论》为研究对象,简单介绍其内容,着重分析了其中所应用的方法论,主要从以实践为基础的方法论、社会系统方法论和矛盾研究方法入手,结合书中具体事例对各个观
休眠蛋白 (restin)是内皮抑素 (endostatin)的同源蛋白 ,它们之间相同的氨基酸占整个蛋白质的 6 2 %。休眠蛋白位于胶原XV羧端的非胶原结构域。在大肠杆菌中重组表达的休眠蛋
作为中国历史上首次受命为佤族创制文字的学者,我们长期研究的是佤语以及其他孟高棉语。在研究中我们发现佤语(以及其他孟高棉语)中有许多傣语(以及其他侗台语)音义相同或相
本文介绍全世界已经生产的80台可逆混流式水泵一水轮机的广泛的统计研究成果,为工程师们在初步设计研究阶段提供一份最新的参考资料。 This article presents a wide range
重庆发动机厂生产的康明斯发动机,采用独特的PT供油系统。该系统利用低压输压泵的输油压力P和喷油器进油时间T来控制循环供应量,以适应柴油机不同工况的需要。在PT泵上装有