就武钢烧结厂环冷鼓风机在加装余热发电系统后遇到的一些故障及其处理实例作了详细介绍,尤其是风机结构和热位移相互关系及热位移状态下机组零部件的调整,对于今后同类机组进行余热利用项目建设和改造具有一定的参考意义。
Some problems encountered during the installation of waste heat power generation system and its treatment examples were introduced in detail, especially the relationship between the structure of the fan and the thermal displacement and the adjustment of the components of the unit under the condition of the thermal displacement. In the future, The similar units for waste heat utilization project construction and transformation of a certain reference value.