论文部分内容阅读
为切实贯彻执行《福建省进一步提高口岸大通关工作效率的具体措施》,结合集装箱运输发展的实际情况,厦门港务集团成立口岸大通关专业推进小组,负责该项工作。厦门市实施口岸大通关协调小组的年内目标是:实现出口货物在单证齐全、有效、准确的前提下,口岸整体通关平均时间从原来的3.1个工作日降低到2个工作日以内,进口货物整体通关平均时间从原来的6.5个工作日降到4个工作日以内。为实现该目标,港务集团承诺:(1)码头方面(集团所属的海天码头和海沧港务公司):①平均装卸效率:远洋干线每台桥吊20MOVES/HOUR,近洋航线25MOVES/HOUR,②提、卸箱平均时间:以拖车进卡口为起点,30分钟以内完成。③根据口岸可验单位的要求,在接到调柜指令的下半个工作日,将货柜运抵指定的查验场所,即上午接到指令,下午4:00以前完成,下午接到指
In order to effectively implement the “Specific Measures for Further Improving the Efficiency of Customs Clearing at Ports in Fujian Province” and in light of the actual situation of container transport development, Xiamen Port Group has set up a special team for promoting major ports of commerce in port and is responsible for the work. Xiamen City, the implementation of the port clearance coordination group’s goal is: to achieve the export of goods documents complete, effective and accurate under the premise of the overall port clearance time from the original 3.1 days reduced to 2 working days less than the import goods The overall average clearance time from the original 6.5 days reduced to 4 working days or less. In order to achieve this goal, the port group promised: (1) Terminal (Haitian Terminal and Haicang Port Co., Ltd.): ① Average loading and unloading efficiency: 20MOVES / HOUR for each crane on offshore lines and 25MOVES / HOUR for near ocean routes; ② Mention, unloading the average time: the trailer into the bayonet as a starting point, completed within 30 minutes. ③ According to the requirements of the port inspection unit, upon receipt of the instructions for cabinet cabinet transfer, the container shall be transported to the designated place of inspection for instruction in the morning, completed before 4:00 pm and received in the afternoon