论文部分内容阅读
甘肃省瓜州县北大桥第六风电场AB区400 MW工程在建设过程中会产生一定量的水土流失,经过深入细致地实地勘查项目建设过程中可能产生的水土流失分布及成因,根据项目所在地不同的地理特征,有针对性地提出行之有效的治理措施,并进行工程布局,以期能最大限度地降低该项目建设产生的水土流失对当地及周边生态环境造成的不利影响。
The 400 MW project in the AB area of the No.6 wind farm of North Bridge in Guazhou County of Gansu Province will produce a certain amount of soil and water loss in the process of construction. After careful and in-depth field investigation, the distribution and causes of soil erosion may be generated according to the location of the project Different geographical features, and put forward effective management measures in a targeted manner, and carry out engineering layout with a view to minimizing the adverse impact of soil and water loss caused by the project construction on the local and surrounding ecological environment.