论文部分内容阅读
由于黄河大堤未经过异常洪水的考验,我们又缺乏必要的资料,再加我们技术理论水平低、具体经验少,因此在考虑和研究堤防加固工程时,很难提出恰当的措施。但为
Due to the fact that the Yellow River embankment has not undergone abnormal flood tests and we lack the necessary information, coupled with our low level of technical theory and little specific experience, it is very difficult to put forward appropriate measures when considering and studying the embankment strengthening project. But for