1传统方法喷混凝土衬砌是隧道传统衬砌的一个组成部分,广泛应用于地下工程。喷混凝土获得强度的模式与普通混凝土类似,呈典型的“S”形曲线。对喷混凝土进行强度监测具有重要意义,基于2个理由:(1)人员回到掌子面的时间,这取决于喷混凝土发展到适当的强度;(2)喷混凝土衬砌随着隧道向前延伸而承受荷载,喷混凝土与加载速度相对应获得承载强度,所以,在各个时间段都能保证安全,衬砌不会产生超应力。
A traditional method Sprayed concrete lining is an integral part of the tunnel lining, widely used in underground engineering. The pattern of strength of shotcrete is similar to that of ordinary concrete, showing a typical “S” curve. The strength monitoring of shotcrete is of great importance for two reasons: (1) the time it takes for the personnel to return to the face, depending on the proper strength of the shotcrete; (2) the shotcrete lining extends forward of the tunnel The bearing load, shotcrete and loading speed corresponding to the bearing strength, so in all time periods can ensure safety, lining will not produce over-stress.