论文部分内容阅读
前言钢筋混凝土水池或砖石砌体水池施工完毕,必须进行满水试验,符合国家标准,方为合格。满水试验就是按设计水位把水池充满水,检验水池的渗水量,并进行外观检查。渗水量试验的主要技术问题就是如何保证所测渗水量的准确性,和所制订的允许渗水量标准的科学性。
Foreword After the completion of construction of reinforced concrete pool or masonry masonry basin, a water-filled test must be conducted and it must meet the national standards to be qualified. The full water test is to fill the pool with water according to the design water level, check the water seepage of the pool, and conduct visual inspections. The main technical problem of the water seepage test is how to ensure the accuracy of the measured water seepage quantity, and the scientific nature of the standard of allowable water seepage.