论文部分内容阅读
BIM技术的实际运用在施工单位有了一定的发展,并且有效的解决了业主及施工单位的实际问题。而作为设计方在此方面有落后的情况。结合实际项目谈BIM的转化运用,让设计单位注意BIM对传统设计方式的改变。从中发现以往传统设计不能体现或满足的功能,并将其作为设计的新亮点,并且可以和施工相结合,提升设计质量。
The actual use of BIM technology in the construction unit has a certain development, and effectively solve the practical problems of the owners and construction units. As a design side in this area backward situation. BIM with the actual project on the conversion of use, so that the design unit to pay attention to the traditional BIM design changes. From the traditional design can not be found in the past to meet or meet the function, and as a new bright spot in the design, and can be combined with the construction and improve the quality of the design.