工程量清单是对拟建工程中的全部内容及各个项目在经过计算后,以工程量表或者汇总表的形式进行展现,必需满足建筑工程施工图纸的要求和招标的具体要求;计算规则的应用必需按照统一的标准、编制规则要求来进行。采用工程量清单的方式对标底的淡化、管理、控制都起到重大的作用;工程施工过程中,已完成项目的工程款结算是参照工程量清单来进行的;工程的实施阶段,所有工程项目的执行内容及原则都应当严格按照工程量清单报价来进行;招投标的成功与否将直接由合理、准确的工程量清单来决定;工程量清单在一定程度上减少了各项人力、物力、财力的投入。
Bill of Quantities is the entire contents of the proposed project and after the calculation of each project, the engineering scale or summary table to show the need to meet the construction drawings and the specific requirements of the tender; Calculation of the application of the rules Must follow a uniform standard, the preparation of rules and requirements. The way of using the bill of quantities plays a significant role in the desalination, management and control of the bidding end. In the process of project construction, settlement of the project amount of the completed project is carried out with reference to the bill of quantities. In the implementation phase of the project, all the projects The implementation of the content and principles should be carried out in strict accordance with the quotations of the bill of quantities to carry out; the success of bidding will be directly from a reasonable and accurate bill of quantities to determine; bill of quantities to a certain extent, reduce the manpower and material resources, Financial investment.