摘要:电气安装工程是一个系统工程,其质量不仅仅会影响到工程的交付使用功能,也会影响生产、生活的安全及财产问题,尤其是工业电气安装必需要给予足够的重视,加强质量控制力度才是保证电气安装工程的质量和工艺技术水平的根本。本文基于我国电气行业发展的现状主要对其质量控制与安装工艺技术作初浅的研究与分析。
关键词:工业电气、安装工艺、质量控制、技术研究
Abstract: the electrical installation project is a systems engineering, and its quality not only affect the project delivery to use a function, can also affect the safety of the production, life and property problem, especially industrial electrical installation must give enough attention, strengthen the efforts to control the quality guarantee is electrical installation quality and technology level of basic. Based on the present situation of the development of China''s electrical industry for its main quality control and installation technology as first shallow research and the analysis.
Keywords: industrial electrical, installation process, quality control, technology research
中图分类号:O213.1文献标识码:A 文章编号:
一、电气工程安装阶段的质量控制
在现代建筑施工中,我们一直孜孜不倦地以追求投资成本、施工质量和施工进度为最终的三大控制目标,以创优工程实现企业的社会效益和经济效益,工业电气安装工程如是。由于电气系统在我国工业建筑电气工程中的重要性不言而喻,加强对电气工程安装阶段的质量控制力度是绝对必要的。笔者认为电气安装工程的质量控制措施应包括以下几方面:
电气安装工程施工技术方案是作为指导施工的依据,其编制质量的好与坏将直接影响到安装施工质量。对此,在展开安装施工之前就需要对工程的总施工组织设计所涉及到的施工工序流程、施工工艺和各项编制质量技术措施进行严格审查,再次进行相关的可行性研究,核实设计是否符合规范设计要求,而施工工艺技术必需要满足技术规范和操作规程。最后由主要技术负责人向施工人员悉心交底,适时到现场指导工作。电气安装应根据设计施工图纸的内容,必需要保证严格按照施工图纸内容进行规范施工,不得在设计不变的基础上胡干蛮干,任意妄为。
实施安装质量目标的预控措施,要分清各个工序中的关键环节,凡事有预则明而有明则清,务必通过对施工合同内容进行仔细推敲,加强预控管理,以实现电气工程系统应具备良好的使用功能和质量。如,配电箱内的电器应注意安装顺序,在绝缘电器安装板上首先安装主体元构件,保证主体元构件能夠紧固在配电箱箱体内,绝缘电器安装板应与配电箱体作电气连接。各种电器需按照规定的位置紧固在安装板上,且各个电器设备之间、设备与板四周的距离也应符合有关工艺标准的要求。工作零线应通过接线端子板连接,并应与保护零线接线端子板分设,连接线采用绝缘导线,导线的型号及截面应严格执行临电图纸的标示截面,导线接头不得松动,不得有外露带电部分。导线剥削处不应伤线芯过长,导线压头应牢固可靠,多股导线不应盘圈压接,应加装压线端子。
应具有完善的质量检测管理系统,以提高质量检验的效果,这也是能够正确判断安装施工质量的基础之一。同时,采取科学合理地检验办法,在硬件设施上讲究精度检测,尤其是保证检测工具、仪器仪表保持完好状态。在保证严格执行技术规范和操作规程的基础上,每一道安装工序都必需在完成后向监理工程师报检,检验合格后方可进行下一道工序。其中,如有发现不符和规范标准或质量隐患,必需及时向上通报,以求上级管理层给予有效地补救整治措施,消除隐患,防患于未然。
电气工程安装施工中,专门组教育培训学习班,努力提高现场电气工程师及施工劳务人员自身的专业技能和综合素质。在安装施工过程中也要控制施工技术人员结合工程实际边干边学,不断积累,牢记相关规范的条例,对于工程而言也是必不可缺的一个环节。
二、电气工程设备安装的工艺技术分析与研究
2.1 电气工程设备安装工艺技术的常见问题
(一)温度补偿型伸缩节调整
温度补偿型伸缩节主要是被应用于吸收因热胀冷缩振动或由其它外力作用所引起的管道或设备的小量位移。如若伸缩节在调整过程中没有刻意注意到尺寸的变化将使的伸缩节受拉变形或受压变形从而失去原有的作用。鉴于此,在针对电气安装施工过程中应尽量避免对这种温度补偿型伸缩节的调整。
断路器油压闭锁
锁测量操作机构断路器油压封闭的主要参数需通过逐项的现场测试。如果在设计方面出现一些偏差,往往会出现将重合闸闭锁油压和合闸闭锁油压回路合并考虑的情况,问题在于重合闸闭锁油压只用于重合闸回路闭锁,闭锁值能够保证断路器进行一次 O - C - O 操作:合闸闭锁油压则用于断路器合闸回路闭锁,闭锁值能够保证断路器进行一次 C - O 操作,由此看来重合闸闭锁油压值与合闸闭锁油压值进行比较,多了一次分闸操作的同时相应油压也会降低更多。这种情况会导致当开关重合于永久故障而液压下降较多时会闭锁分闸回路造成断路器拒分,容易发生事故。
系统主回路电阻测量标准
相关的规范规程内容明确要求电气系统的主回路电阻测量应采用不低于100毫安的直流压降法,而测得电阻值也需控制在112Ru以内,并通过作三相不平衡度比较试验分析其合理性。建设业主单位在相关仪器仪表出厂是也应要求生产厂家出具主回路电阻测量试验证明,通过两方对比,寻求可参照值。
工频耐压试验值的确定
电气设备成品在做型式试验时断口间工频耐压试验值往往很难以满足设备技术协议要求,断路器设备在停电时可能会出现击穿事故。因此,型式试验前应注意相关的外购元件如套管等的耐压水平是否可以满足要求再制订相关的试验方案。另外,在试验时避雷器、电压互感器和电缆终端等应隔开,CT回路也应以短接处理。
2.2 常见设备工艺技术控制措施
(一)配电盘(柜)安装
配电盘(柜)安装包括盘柜基础制作安装、盘柜运输、盘柜就位找正、母线安装调整、开关调整、盘柜接地。同一场所同一平面的基础安装后水平误差<1mm/m,全长不超过5 mm;平直度<1mm/m,全长不超过5 mm;中心误差<5mm。盘柜的装卸和运输,应由起重工负责指挥,电工配合。开关柜单独或成排安装时,其垂直度偏差每米不大于1.5mm,水平度相邻两盘顶部不大于1.0mm,成排列盘顶部不大于3.0mm。柜间隙不大于1.5mm。母线的接线面连接紧密,连接螺栓用力矩板手按规范值紧固。盘体接地,每段盘至少应有2点及以上的明显接地,底架与基础接触应导通良好,装有电气可开启屏门的接地应采用软导线。
(二)电机设备安装
电机设备安装包括装卸、拖拉、起吊、垫铁放置和将设备固定在其最终位置上。拆除过程应在运输和存放期间避免设备损坏而安置临时支架、托架或其它保护物,施工中修复可能发生的任何损坏。在不影响设备运行的情况下,去除在运输和施工过程中用于保护设备所加的防锈介质、油、油脂等。设备就位之前,应对照图纸进行检查,核实法兰、管口、接线盒、联轴节以及其它需要外部连接的部位。
(三)水泵设备安装
水泵设备安装遵循“基础检验→水泵就位安装→检测与调整→润滑与加油→试运转”的工艺流程,检测与调整需将水泵与电机采用联轴器连接时,用百分表、塞尺等在联轴器的轴向和径向进行测量和调整,联轴器轴向倾斜不应大于0.8/1000,径向位移不应大于0.1mm。调整水泵与电机同心度时,应松开联轴器上的螺栓、水泵与电机和底座连接的螺栓,采用不同厚度的簿钢板或簿铜皮来调整角位移和径向位移直至合格。试运转则需打开进水阀门、水泵排气阀,使水泵灌满水,将水泵出水管上阀门关闭。先点动水泵,检查有无异常、电动机的转向是否符合泵的转向要求。然后启动水泵,慢慢打开出水管上阀门,检查水泵运转情况、电机及轴承温升、压力表和真空表的指针数值、管道连接情况,应正常并符合设计要求。
三、结束语
电气工程安装施工过程虽然繁复,质量要求标准相对也比较高,但是在保证完成对各个流程中的技术准备工作,施工中严格遵循国家有关规范规程,并严格执行质量控制程序,电气工程设备安装工程在施工质量、施工进度及投资成本方面是可以协调统一实现的。
参考文献
[1] 曹占兴;工业建筑电气安装存在的问题与质量保证措施[J];科技促进发展(应用版);2010,(02)
[2] 许云兴;论影响电气工程施工质量的因素及对策[J];中小企业管理与科技(下旬刊);2009,(03)
[3] 曹占兴;浅谈工业电气安装施工要点、步骤与技术措施;科技促进发展(应用版);2010,(08)
[4] 计鹏;工业电气安装工程实用技术手册;中国电力出版社;2004,12
关键词:工业电气、安装工艺、质量控制、技术研究
Abstract: the electrical installation project is a systems engineering, and its quality not only affect the project delivery to use a function, can also affect the safety of the production, life and property problem, especially industrial electrical installation must give enough attention, strengthen the efforts to control the quality guarantee is electrical installation quality and technology level of basic. Based on the present situation of the development of China''s electrical industry for its main quality control and installation technology as first shallow research and the analysis.
Keywords: industrial electrical, installation process, quality control, technology research
中图分类号:O213.1文献标识码:A 文章编号:
一、电气工程安装阶段的质量控制
在现代建筑施工中,我们一直孜孜不倦地以追求投资成本、施工质量和施工进度为最终的三大控制目标,以创优工程实现企业的社会效益和经济效益,工业电气安装工程如是。由于电气系统在我国工业建筑电气工程中的重要性不言而喻,加强对电气工程安装阶段的质量控制力度是绝对必要的。笔者认为电气安装工程的质量控制措施应包括以下几方面:
电气安装工程施工技术方案是作为指导施工的依据,其编制质量的好与坏将直接影响到安装施工质量。对此,在展开安装施工之前就需要对工程的总施工组织设计所涉及到的施工工序流程、施工工艺和各项编制质量技术措施进行严格审查,再次进行相关的可行性研究,核实设计是否符合规范设计要求,而施工工艺技术必需要满足技术规范和操作规程。最后由主要技术负责人向施工人员悉心交底,适时到现场指导工作。电气安装应根据设计施工图纸的内容,必需要保证严格按照施工图纸内容进行规范施工,不得在设计不变的基础上胡干蛮干,任意妄为。
实施安装质量目标的预控措施,要分清各个工序中的关键环节,凡事有预则明而有明则清,务必通过对施工合同内容进行仔细推敲,加强预控管理,以实现电气工程系统应具备良好的使用功能和质量。如,配电箱内的电器应注意安装顺序,在绝缘电器安装板上首先安装主体元构件,保证主体元构件能夠紧固在配电箱箱体内,绝缘电器安装板应与配电箱体作电气连接。各种电器需按照规定的位置紧固在安装板上,且各个电器设备之间、设备与板四周的距离也应符合有关工艺标准的要求。工作零线应通过接线端子板连接,并应与保护零线接线端子板分设,连接线采用绝缘导线,导线的型号及截面应严格执行临电图纸的标示截面,导线接头不得松动,不得有外露带电部分。导线剥削处不应伤线芯过长,导线压头应牢固可靠,多股导线不应盘圈压接,应加装压线端子。
应具有完善的质量检测管理系统,以提高质量检验的效果,这也是能够正确判断安装施工质量的基础之一。同时,采取科学合理地检验办法,在硬件设施上讲究精度检测,尤其是保证检测工具、仪器仪表保持完好状态。在保证严格执行技术规范和操作规程的基础上,每一道安装工序都必需在完成后向监理工程师报检,检验合格后方可进行下一道工序。其中,如有发现不符和规范标准或质量隐患,必需及时向上通报,以求上级管理层给予有效地补救整治措施,消除隐患,防患于未然。
电气工程安装施工中,专门组教育培训学习班,努力提高现场电气工程师及施工劳务人员自身的专业技能和综合素质。在安装施工过程中也要控制施工技术人员结合工程实际边干边学,不断积累,牢记相关规范的条例,对于工程而言也是必不可缺的一个环节。
二、电气工程设备安装的工艺技术分析与研究
2.1 电气工程设备安装工艺技术的常见问题
(一)温度补偿型伸缩节调整
温度补偿型伸缩节主要是被应用于吸收因热胀冷缩振动或由其它外力作用所引起的管道或设备的小量位移。如若伸缩节在调整过程中没有刻意注意到尺寸的变化将使的伸缩节受拉变形或受压变形从而失去原有的作用。鉴于此,在针对电气安装施工过程中应尽量避免对这种温度补偿型伸缩节的调整。
断路器油压闭锁
锁测量操作机构断路器油压封闭的主要参数需通过逐项的现场测试。如果在设计方面出现一些偏差,往往会出现将重合闸闭锁油压和合闸闭锁油压回路合并考虑的情况,问题在于重合闸闭锁油压只用于重合闸回路闭锁,闭锁值能够保证断路器进行一次 O - C - O 操作:合闸闭锁油压则用于断路器合闸回路闭锁,闭锁值能够保证断路器进行一次 C - O 操作,由此看来重合闸闭锁油压值与合闸闭锁油压值进行比较,多了一次分闸操作的同时相应油压也会降低更多。这种情况会导致当开关重合于永久故障而液压下降较多时会闭锁分闸回路造成断路器拒分,容易发生事故。
系统主回路电阻测量标准
相关的规范规程内容明确要求电气系统的主回路电阻测量应采用不低于100毫安的直流压降法,而测得电阻值也需控制在112Ru以内,并通过作三相不平衡度比较试验分析其合理性。建设业主单位在相关仪器仪表出厂是也应要求生产厂家出具主回路电阻测量试验证明,通过两方对比,寻求可参照值。
工频耐压试验值的确定
电气设备成品在做型式试验时断口间工频耐压试验值往往很难以满足设备技术协议要求,断路器设备在停电时可能会出现击穿事故。因此,型式试验前应注意相关的外购元件如套管等的耐压水平是否可以满足要求再制订相关的试验方案。另外,在试验时避雷器、电压互感器和电缆终端等应隔开,CT回路也应以短接处理。
2.2 常见设备工艺技术控制措施
(一)配电盘(柜)安装
配电盘(柜)安装包括盘柜基础制作安装、盘柜运输、盘柜就位找正、母线安装调整、开关调整、盘柜接地。同一场所同一平面的基础安装后水平误差<1mm/m,全长不超过5 mm;平直度<1mm/m,全长不超过5 mm;中心误差<5mm。盘柜的装卸和运输,应由起重工负责指挥,电工配合。开关柜单独或成排安装时,其垂直度偏差每米不大于1.5mm,水平度相邻两盘顶部不大于1.0mm,成排列盘顶部不大于3.0mm。柜间隙不大于1.5mm。母线的接线面连接紧密,连接螺栓用力矩板手按规范值紧固。盘体接地,每段盘至少应有2点及以上的明显接地,底架与基础接触应导通良好,装有电气可开启屏门的接地应采用软导线。
(二)电机设备安装
电机设备安装包括装卸、拖拉、起吊、垫铁放置和将设备固定在其最终位置上。拆除过程应在运输和存放期间避免设备损坏而安置临时支架、托架或其它保护物,施工中修复可能发生的任何损坏。在不影响设备运行的情况下,去除在运输和施工过程中用于保护设备所加的防锈介质、油、油脂等。设备就位之前,应对照图纸进行检查,核实法兰、管口、接线盒、联轴节以及其它需要外部连接的部位。
(三)水泵设备安装
水泵设备安装遵循“基础检验→水泵就位安装→检测与调整→润滑与加油→试运转”的工艺流程,检测与调整需将水泵与电机采用联轴器连接时,用百分表、塞尺等在联轴器的轴向和径向进行测量和调整,联轴器轴向倾斜不应大于0.8/1000,径向位移不应大于0.1mm。调整水泵与电机同心度时,应松开联轴器上的螺栓、水泵与电机和底座连接的螺栓,采用不同厚度的簿钢板或簿铜皮来调整角位移和径向位移直至合格。试运转则需打开进水阀门、水泵排气阀,使水泵灌满水,将水泵出水管上阀门关闭。先点动水泵,检查有无异常、电动机的转向是否符合泵的转向要求。然后启动水泵,慢慢打开出水管上阀门,检查水泵运转情况、电机及轴承温升、压力表和真空表的指针数值、管道连接情况,应正常并符合设计要求。
三、结束语
电气工程安装施工过程虽然繁复,质量要求标准相对也比较高,但是在保证完成对各个流程中的技术准备工作,施工中严格遵循国家有关规范规程,并严格执行质量控制程序,电气工程设备安装工程在施工质量、施工进度及投资成本方面是可以协调统一实现的。
参考文献
[1] 曹占兴;工业建筑电气安装存在的问题与质量保证措施[J];科技促进发展(应用版);2010,(02)
[2] 许云兴;论影响电气工程施工质量的因素及对策[J];中小企业管理与科技(下旬刊);2009,(03)
[3] 曹占兴;浅谈工业电气安装施工要点、步骤与技术措施;科技促进发展(应用版);2010,(08)
[4] 计鹏;工业电气安装工程实用技术手册;中国电力出版社;2004,12