论文部分内容阅读
一、法国港口法国港口的改革经过一系列运作终于尘埃落定,港口管理局原拥有的码头经营权全部移交到私营公司手中。在法国第一大港马赛港内,2011年5月3日,私营公司接管了福斯集装箱码头和干散货码头;5月16日,马赛福斯港口管理局移交了福斯油码头经营权;6月5日又移交了马赛集装箱码头的经营权。港内的大部分设备也由新的运营商出资购买,其中大型设备有福斯集装箱码头6台超巴拿马型集装箱装卸桥、干散货码头4台装船机和卸船机、油码头的装油臂及各类管道、马赛集装箱码头5台
First, the French port France’s reform of the port after a series of operations finally settled, the port authority originally owned by the right to transfer all the right to the hands of private companies. In France’s largest port of Marseille, May 3, 2011, private companies took over Fox Container Terminal and dry bulk terminals; on May 16, the Port Authority of Marseille transferred the operation of Fox Oil Terminal; 6 On the 5th, the operation rights of the container terminal in Marseille were transferred again. Most of the equipment in the port is also financed by new operators, including six large Trans Panamax container loading and unloading bridges at Flowserve Container Terminal, four loading and unloading machines at dry bulk terminals and a loading arm at the oil terminal And various types of pipes, Marseille Container Terminal 5