沙曲选煤厂是华晋焦煤有限责任公司离柳矿区沙曲煤矿的配套项目,地处河东煤田离柳矿区腹部,座落在山川河畔,厂区紧靠307国道,孝柳铁路横穿厂区,与柳林电厂隔河相望,具有便利的交通条件和充足的水电资源。一期工程建设规模为150万t/a,于1992年11月10日开工,1996年建成并试生产,采用跳汰-浮选联合工艺流程,主导产品为8级、9级冶炼焦精煤,产品主要销往宝钢、首钢、太钢等国内十多家大型钢铁企业,部分产品出口韩国、日本等国家和地区。沙曲选煤厂二期工程建设规模为3000万t/a,总投资9975万元,经招投标,由邯郸设计院设计,澳大利亚申克公司总承包建设,于2004年9月10日奠基开工。采用脱泥有压两产品重介旋流器主再洗分选,煤泥浮选、浮精加压过滤脱水、尾煤采用隔膜式压滤机脱水的联合工艺流程。主厂房采用模块式结构,布置紧凑,利于管理,占地面积小,投资少,建设周期短。主要设备有:澳大利亚进口φ1300mm上洗旋流器,φ900mm再洗旋流器,申克天津公司生产的系筛子,SCC-1500离心机。大武口矿山机械厂生产的XJM-S16A浮选机,山东莱芜机械厂生产的GPJ-120盘式加压过滤机,河北衡水海江压滤机厂生产的XMGZ350/1600-X/U压滤机等。工程项目于2005年7月15日成功实现带负荷试运转,目前已进入试生产阶段,根据国家有关规定试生产半年后申请验收正式投产。
Shaqu Coal Preparation Plant is Shanxi Jin coking coal limited liability company from the mining area Shaqu mine supporting projects, is located in Hualong coal mine Liu Liu area abdomen, located in the mountains and rivers, the plant close to 307 National Road, the Xiaoliu Railway crossing the plant, Liulin power plant and across the river, with convenient traffic conditions and adequate water and electricity resources. A construction scale of 1.5 million t / a, started in November 10, 1992, built in 1996 and trial production, the use of jig - flotation process, the leading products for the 8, 9 smelting coke coal , The products are mainly sold to more than 10 large steel enterprises in China, including Baosteel, Shougang and TISCO, some of which are exported to South Korea, Japan and other countries and regions. Shaqu Coal Preparation Plant Phase II construction scale of 30 million t / a, a total investment of 99.75 million yuan, the bidding, design by the Handan Institute of Design, Australia Schenck general contractor construction, laid the foundation stone in September 10, 2004 . The desulphurization and pressurization of two products HM cyclone main re-washing sorting, slime flotation, floating fine filter pressure dehydration, tail coal filter membrane dehydration using a combination of process. The main plant with modular structure, layout is compact, conducive to management, small footprint, less investment, short construction period. The main equipment are: imported from Australia φ1300mm on the wash cyclone, φ900 mm wash the cyclone, Schenck Tianjin Company Department of sieve, SCC-1500 centrifuge. XJM-S16A flotation machine produced by Dawukou Mining Machinery Factory, GPJ-120 disc pressure filter manufactured by Shandong Laiwu Machinery Factory, XMGZ350 / 1600-X / U filter press manufactured by Hengshui Haijiang Filter Press Factory, etc. . The project was successfully put into trial operation with load on July 15, 2005. At present, it has entered the stage of trial production and formally put into production for half an year after trial production according to relevant state regulations.