论文部分内容阅读
1工程概况恰甫其海水电站厂房采用地面厂房,电站装机4台,单机容量为80MW,总装机容量320MW。开关站采用户内GIS设备。主厂房长127m,宽25.5m,发电机层高19.2m,分机组段和安装间段,安装间布置在主厂房的左端。其主厂房是目前新疆在建水电站中面积最大的,发电机层以上建筑面积为25.
1 Project Overview Qiafuqihai Hydropower Plant using ground-based plant, power station installed capacity of 4 units, single capacity of 80MW, with a total installed capacity of 320MW. Switch station with indoor GIS equipment. The main plant length 127m, width 25.5m, generator layer height 19.2m, extension unit and installation of the interval, the installation of the layout of the main plant in the left. The main plant is the largest in Xinjiang Hydropower Station under construction, the generator above the floor area of 25.