今年我们根据上级指示,支援电力建设部门一个扩建新机组的土建工程。这个工程虽属扩建项目,但整个系统,除水泵房外,全都新建,其中包括主厂房、锅炉汽机等设备基础、烟囱、控制大楼、引风机室、屋外变电构架、水处理室、水塔、水池、输煤系统、生活水泵房、过滤池、循环水管、虹吸井等18个项目。工程的特点是:确定项目
This year, according to the instructions of the superior, we will support the electric power construction department to expand the civil works of the new unit. Although this project is an expansion project, the entire system, except for the water pump house, is newly built, including the main building, boiler steam turbine and other equipment foundations, chimneys, control buildings, draught fan room, outdoor electricity transformation framework, water treatment room, water tower, There are 18 projects such as pools, coal transportation systems, living water pump houses, filtration tanks, circulating water pipes, and siphon wells. The characteristics of the project are: determine the project