山东省协庄煤矿矿长冯际岭曾有一件烦心事:矿上近几年花了几千万元资金引进大批国内外先进的机电设备,增强了矿井安全系数,产量大幅度提高,这本是件好事,可机电设备待修率大大降低,全矿6个机电厂的工人没活干,400多口子人多半时间闲着,等着矿上安排工作,要开工资还要发奖金,靠在矿上这口大锅里吃“原煤饭”。 矿上分管机电的副总工程师王
Feng Jiling, the mine director of the Xiezhuang coal mine in Shandong province, once had an annoyance: In recent years, the mine has spent tens of millions of yuan to introduce a large number of advanced mechanical and electrical equipment at home and abroad, which has enhanced the safety factor of the mine and greatly increased the output. This is a piece of material. Good news, the rate of repairs for electromechanical equipment has been greatly reduced. The workers of the 6 ore-powered power plants in the entire mine have not worked, more than 400 people are idle, waiting to arrange work on the mines, and have to pay bonuses to open wages, relying on mines. Take the raw coal meal in this big pot. The chief engineer of the mine in charge of electromechanical