论文部分内容阅读
从电气化铁路牵引变压器容量设计出发,考虑运输“点”能力不足,做到科学管理、减少能耗;经济运行、节约成本。
Starting from the design of traction transformer capacity of electrified railway, considering the lack of capacity of transportation “point”, we can achieve scientific management and reduce energy consumption; economic operation and cost saving.