论文部分内容阅读
某联合站由于进站液量增加,含水增高,现有流程不能满足正常生产需要,优化站内游离水脱除器的结构,以提高分水效率,节约能源。
Due to the increase of the pumping station and the increase of the water content in a combined station, the existing process can not meet the normal production needs and the structure of the free water removal station in the station is optimized to improve the water diversion efficiency and save energy.