论文部分内容阅读
提出了把耿村矿现有的3个采区合并为2个采区的合理集中生产方案,并对方案可行性及技术经济效果进行了分析。
Put forward the reasonable centralized production plan that merges the existing 3 mining areas in Gengcun mine into 2 mining areas and analyzes the feasibility of the scheme and technical and economic effects.