论文部分内容阅读
我砖厂自 1998年 10月从重庆市一家机械厂购进挤泥机成套设备 ,11月安装调试投产。挤泥机在运行中存在以下问题 :①挤泥机机头摇头现象严重 ,圆周跳动 3~ 5mm ;②挤泥机的压泥板处的主轴轴承位置处两副螺栓易断 ,其使用周期仅有15~ 30天 ;③挤泥机尾部 (减速器侧 )轴承座内
In October of 1998, the brick factory purchased a complete set of equipment for the squeezer from a machinery factory in Chongqing, and installed, commissioned and put into operation in November. In the operation of the squeezing machine, there are the following problems: 1 The head of the squeezing machine head is shaking and the circumference is 3 to 5mm; 2 The two bolts at the position of the spindle bearing at the squeegee of the squeezing machine are easy to break, and its use cycle is only There are 15 to 30 days; 3 The end of the mud squeezer (rearer side) in the bearing seat