对于高铁项目水土保持设施验收技术评估工作,应重点关注技术评估单位进场至召开启动会议期间开展的工作,前期准备工作(主要包括建立工作联系制度、资料准备、现场查勘和沟通协调)开展情况;同时针对高铁项目水土保持工作的特殊性,针对弃渣场、开挖边坡、大临工程、临时措施等明确技术评估要点。按照技术评估工作要求,确定建设、设计、施工、监理、监测和技术评估单位职责,从而推动技术评估工作有序开展。
For the technical assessment of the acceptance of soil and water conservation facilities for HSR projects, attention should be given to the work carried out by the technical evaluation units during the period from the entry to the start-up meeting to the start-up meeting. The preparatory work (mainly including establishment of work contact system, data preparation, site survey and communication and coordination) At the same time, according to the peculiarity of soil and water conservation work of high-speed railway project, the key points of technical evaluation should be clarified for spoil grounds, excavation slope, large-scale project and temporary measures. According to the requirements of technical assessment work, the responsibilities of construction, design, construction, supervision, monitoring and technical assessment units shall be determined so as to promote the orderly development of technical assessment work.