论文部分内容阅读
安钢制氧厂2#14000m3/h制氧机2001年投产,其DCS系统是Honeywell生产的TPS系统,是一套封闭控制系统,它的开放性不好,而且专用操作站的维护成本高,在连续使用多年,可靠性、稳定性逐步降低。通过对TPS系统GUS操作站升级问题进行优化,使这一问题得到了初步解决,保证了TPS系统的稳定运行。
Angang Oxygen Plant 2 # 14000m3 / h oxygen plant put into operation in 2001, the DCS system is Honeywell TPS system is a closed-loop control system, its openness is not good, but also the maintenance of dedicated operating station high cost, In continuous use for many years, reliability, stability and gradually reduce. Through the optimization of the GUS operation station upgrade problem in the TPS system, this problem has been initially solved, ensuring the stable operation of the TPS system.